Discover how rejected heat from industrial outlets including data centres could be used to heat homes and more – but only if a shared approach can be agreed on.
With demand for energy in 2024 climbing at its fastest rate over the past decade, it’s clear our appetite for power will inevitably increase throughout the rest of the decade and beyond. This is at the same time as concerns continue to snowball over sustainability and the threat of energy production to the climate. It’s quite the toxic mix and one that needs serious ‘blue sky thinking’ to source a solution.
However, there is no silver bullet. Instead, we need to look at multiple solutions to create a progressive strategy – and one that should feature the significant potential of heat export. The concept is simple: Take the rejected heat from industrial processes and utilise it productively elsewhere as source of repurposed energy, instead of simply ejecting it into the atmosphere.
The good news is that many industries – including data centres – are already capturing waste heat. “Methods of capturing heat from data centres are now fairly developed and can be implemented on most data centre chilled water systems,” says Tobin Pettit, JDA’s Building Services Engineer.
Ointment, meet fly
In theory, the approach reduces carbon output, minimises additional energy consumption and provides energy to support the cost of living. However, there are several issues that must be addressed. For instance, “one must look at the full life cycle and embodied carbon of any additional equipment that is required in the installation and use of heat export,” explains Robert Pidgeon, JDA’s Design and Commercial Manager.
“Heat export could support energy security but will not replace it due to the times of year that heat is required and, in the case of data centres, its ‘low grade’ heat that is exported and requires an additional step up plant to improve its usage – but this also requires energy.” And let’s not even begin to get into the whole ‘pipe problem’.
Fly, meet spider
Then there are the ‘big picture’ issues: “Normally the limiting factor is the heat network that supplies outside customers,” says Pettit. “The time it takes to install such a heat network could take many years and it is unclear who would fund it.” The heat network would also be separate from the energy grid. This would require major funding and building to make it a nationwide – or at least, local – proposition so it could be used to power homes and businesses.
To tackle this somewhat dispiriting list of issues, heat export should be considered at the beginning of any project. “On a grand scale, this needs thought from the start,” says Pidgeon. “Ideally, this could grow as an economy of scale but needs to be factored to the foundations of projects and intertwined as part of a bigger plan.”
Other big questions need to be answered, too; for instance, who will control the plant required to upgrade the heat? Who will maintain it and who will make the initial investment? Where will the heat network be installed as its location requirements are often different to that of a data centre?
Seeking solutions
Clues to the answers can be found in pockets of innovation scattered across the world. For instance, in Stockholm, Sweden, a heating network was begun back in the 1950s and today spans 3,000 km, leading to the creation of Open District Heating in 2014. This encourages industry – in particular, data centres – to build their facilities near to the network and distribute their wasted heat. By 2022, this approach was enough to provide heating to 30,000 apartments each year.
In nearby Helsinki, Microsoft is working on creating an entire region dedicated solely to data centres, proclaiming it will be, “the world’s largest scheme to recycle waste heat from data centres”, and to provide heating for an entire city. Here in the UK, the London Mayor has unveiled plans to create a district heat network that will provide heat to over 9,000 new homes – all from nearby data centres.
Out of reach?
Such plans are bold and offer genuine hope for tapping into rejected heat’s rich potential. However, to ensure success, government and industry must sit down together and make a concerted effort to create a holistic plan for entire regions, counties – and even countries.
Only by adopting such a collaborative approach can we deliver the much-needed joined-up thinking and shared financial responsibility to make heat export happen – and move away from the mindset that Pidgeon highlights as “a lack of interest – and the will to actually do it.” If we fail to capitalise on such potential, then the benefits of the technology will be at best an exercise in occasional green washing fit only for a press release. At worst, it represents a waste of energy production that could otherwise help transform how we service our ever escalating power needs without inflicting further damage on the planet.
Begin your export journey
Learn how your data centre could be used to produce repurposed energy by booking a call with a JDA consultant.