The UK is experiencing a surge in data centre development – but what happens to the waste heat? Heat recovery is a popular topic of discussion, whether it is how to utilise it or how it can make a project a more inviting prospect; but is heat export from data centres truly viable in the UK or just a feel-good idea with little actual impact?
Data centres can consume huge energy loads, and a considerable amount of this power goes towards the cooling. Therefore, in theory this waste heat could supply residential or district heating systems. There is potential for offsetting carbon, integration with local communities and enhanced credentials. However, the reality is these are rarely implements.
Why?
The reality – why it’s rarely implemented
Technical Challenges
Low grade heat is one issue with return temperatures <40°C which is insufficient for most domestic and industrial implications. You can overcome this with the use of heat pumps, but who installs this? Who manages this? Does it increase complexity and therefore a point of weakness into a data centre is built with resilience as a fundamental building block. If the heat pump is to sit outside the boundary for others to manage, you therefore have part of a critical system lying beyond the boundary and security areas. If you place these systems within the boundary, you then have the risk of others entering the site to manage the equipment. Given the investment to build these facilities, it is not an attractive prospect for a building owner to carry this risk.
Logistical Challenges
Furthermore, heat recovery and district heating systems require space, engineering coordination and sequencing. For example, if a data centre is being retrospectively installed into an area, it’s logistically difficult to install a district heating network and all the associated infrastructure to feed the local area. The installation would be invasive to residents or business users and how do you work between those who want it installed and those who don’t?
Construction Timing
The design and construction of a heat-network and the growth of heat demand will typically take more time than that of a data centre. Therefore, by the time the heat network is able to take heat, the data centre may have been operating for a number of years. Therefore, data centre designs have to consider how a hypothetical heat network may be connected at a later date. In addition, the life of the heat network may far exceed the life of a data centre which can be as low as 10-years and could be subject to changes in demand and technology over that time.
Economic Constraints
Retrofitting and integrating heat export systems adds CAPEX without guaranteed return on investment. Who makes the investment into the heat network infrastructure?
Demand
Waste heat for residential use is majority required in the winter months. Hot water is required in the summer months but the demand is far less through this period of the year. For a large proportion of the year, data centres are often operating in ‘free cooling’ mode which significantly reduces the power demand for cooling. It is in the summer months, and only for points of high ambient temperature, that ‘mechanical cooling’ is utilised. Free cooling is a carbon emission reducing method of cooling and supports lower PUE’s. Therefore, the use of heat export could most effectively support carbon emission reduction at these peak points, however this is when demand is lowest. This means there is a demand miss-match. Leisure centres are a good alternative as they could have a more all-year-round requirement, especially if there is a swimming pool, but the quantity of swimming pools needed to use the heat is not realistic.
Amount of heat available
The amount of heat available from data centres will always depend on its MW IT available as well as its used capacity, but assuming these are used to their maximum, and given some of the sizes of modern data centres/data centre campuses in the 10s, if not 100s of MWs, the available heat will be far greater than can realistically be used. So you could only ever use a small portion of the heat.
Carbon Context – Are there real emissions benefits?
Heat reuse can reduce operational emissions of nearby buildings if the heat is upgraded by low-carbon plant (such as heat pumps) and displace the likes of natural gas or other fossil fuels; but gains are marginal if there is low waste heat from the data centre. This could be the case as some facilities are at low power use; and some remain here for many years. This is hard to predict.
Embodied carbon is also key to consider as the pumps, piping, control systems and the installation all have embodied carbon.
There is also the risk that heat reuse could prove to be a distraction from other more impactful decarbonisation strategies.
There are cases in other countries where heat export as part of district heating systems has been successfully deployed, such as in Denmark and the Netherlands, but these countries have mature district heating networks already installed, but the UK largely does not.
What needs to change?
- Heat export is not something that should not be considered at all, although there do need to be various changes.
- National policies need to be developed in order to integrate this into planning.
- Incentivisation is another option as financial models, such as grants or tax breaks, could be used.
- Collaboration needs to improve, for example, between developers, operators and local authorities, and as experience grows, so will be the potential of the integration of heat networks.
- Designing from day one must also be considered. If there is a wider scheme with a data centre integrated into a scheme with residential areas, leisure centres or industrial units, for instance, heat export needs to be factored into the original strategy as this cannot be retrofitted cheaply.
Conclusion
Heat export is not a silver bullet and currently remains a niche solution. And without fundamental changes, the benefits are outweighed by the complexity and cost, but with the right context in dense urban centres, aligned planning and clear carbon payback calculated, it can play a role in decarbonisation. Other scalable solutions should be explored but in parallel with heat export use.
At JDA, we understand such challenges and opportunities in this fast-developing industry. Get in touch with our expert team of design engineers to discuss your next mission critical project.