By Hugh Francis · Principal Electrical Engineer, J Dunton Associates
Around a month ago, an article was featured on the BBC website titled “’I can’t drink the water’ – life next to a US data centre” (Read the article here). It showcased Beverly Morris in Mansfield, Georgia, US detailing her experience with living next to the construction and subsequent operation of a data centre. It brought a lot of issues to light, primarily with her access to clean water.
With the data centre boom, residents are becoming ever more aware that the once ethereal cloud is moving ever closer to their homes. So, just how good are data centres in the UK to have as neighbours?
When we think of good neighbours, we want people who can share the space, are conscientious with their noise and light pollution, and are easy to solve disputes with if they happen.
Location, location and I’ll say it again… location
Just as location is everything in residential developments, it’s critical for data centres too. They need reliable connections to the electrical grid, water and sewerage systems, multiple fibre links (especially if you are an avid Netflix watcher!), and access to local transport and populations.
During construction several hundred jobs are generated, particularly in engineering and maintenance; operational roles follow, though often fewer in number (FT). Data centres also underpin long-term economic growth: techUK estimates an annual contribution of £4.7 billion in GVA (Gross Value Added) and 43,500 jobs across the UK, with potential for much more by 2035 (techUK).
Local investment is not limited to the data centre itself, grid reinforcement, upgraded water and data services, and EV charging facilities help to raise standard-of-living for neighbours, often without being immediately visible. With thoughtful planning, data centres can become community assets, popular when paired with local amenities or contributions to biodiversity, skills training, and public infrastructure.
Smart design choices
Often, when discussing the sheer scale of a data centre we are presented with a monolithic building as viewed from the air, however the design of the data centre when viewed from ground level is the important factor (unless you are 25m tall, then I do apologise).
The facade of the building serves two purposes: to blend the outline of the building into the local area in a non-intrusive way and to serve as an acoustic barrier to screen noise. During early planning, a noise survey is taken of the area which sets certain benchmarks of which the external acoustic output in the data centre cannot exceed.
BREEAM sets a good standard of construction that we aim to adhere to, even if not pursuing the accreditation. BREEAM sets clear acoustic performance standards: for noise emissions to the nearest receptor, the data centre’s external noise must exceed background levels by no more than 5 dB during the day and 3 dB at night, figures often quoted by planning councils.
On lighting, BREEAM’s ENE 03 External Lighting criteria demand energy‑efficient fixtures and controls, for example presence detection and daylight shut‑off, to minimise light pollution and energy use (BREEAM ENE3). This means thoughtful siting and selection of external lights, balancing security needs with the local environment.
Construction period
The construction phase of a data centre can be a disruptive neighbour, like any other building works happening on your street. It often involves a careful balance between maintaining a project schedule and not creating too much of a nuisance for locals. Construction often involves large plant movement, deliveries and craning, and ground works, all major producers of noise. Effective planning maps out working hours to respect local curfews, restricts noisy operations to daytime windows, and controlled traffic routes to minimise disturbance.
Residents may not immediately see the emerging form of the building during construction however well-designed and considerate the finished centre will be. This is when an ongoing dialogue with the community matters most. Regular updates, open lines for feedback and early notification of particularly loud or intrusive phases can soften the impact and build goodwill.
We shouldn’t see construction as a one-way process; it’s a period when collaboration and transparency can develop a long-term neighbourly trust.
An example of blending with the environment
Bringing the community together
After all, people will have to live next door to this building for a long time. There will always be controversy with new construction projects, particularly when deemed as CNI (Critical National Infrastructure). In an era of the highest house price-to-earnings ratio ever across the UK, it is critically important to listen to the people who are going to be affected by a major change in their local environment, after all, a property purchase is the biggest financial decision people will ever make.
At JDA, we recognise that the construction industry is already making significant strides in delivering better projects and outcomes, however, we believe there is more that can be done. This is why we go further; ensuring that local communities are actively informed and engaged at every stage of projects that will shape their surroundings, not simply consulted as an afterthought.
A data centre is being built near me, what should I do?
Firstly, don’t panic! The best thing you can do is be part of the dialogue as early as you can; work with planning consultants to create local community frameworks as part of the planning package, including extensive consultation with local residents.
How can the data centre work for you? Not all the land purchased is required for the footprint of the building. As more than 50% of data centres are now a ‘campus’ construction, this leaves lots of space for green areas. New swimming pools are often proposed as these can use the wasted heat for improved efficiency!
In the grand scheme of things, when the price of construction can be £12m – £20m per MW (Megawatt) of IT power, the inclusion of community schemes is often a fraction of this. If community schemes are included as part of the planning permission, their recommendations are required to be implemented; being marked as a CNI does not give allowance for data centres to avoid constructing these.
If you’re interested to know more about how JDA works with RIBA Stage 1/2 projects or simply want to know more about what we do; please get in touch! (and send pictures of your dogs – we love dogs!)