Specialists in strategic planning, procurement, design and project management of mission critical systems

JDA specialise in the Strategic Planning, Technical Procurement, Design and Project Management of Mission-Critical systems, ensuring lean, efficient and technically sound data centre facilities. Emphasis is placed upon commercial requirements of the client to ensure maximum value is achieved. This would include availability requirements, timescales and operating costs for both new and existing systems. JDA work on a variety of Mission-Critical data centre projects from small stand-alone projects to large scalable facilities at locations all over the world.

Specialist
Expertise

Specialist Expertise

Sales technical support and customer engineer liaison / Specific knowledge of Hyperscale requirements

Due diligence design reviews

Procurement Technical Support

Technical risk evaluation

Data Centre optimisation reviews / Energy and resilience

Internal and external CFD assessments

Availability calculations

Root cause analysis

Weather and climate analysis

Adaptive PUE calculation

BMS core network design / Technology Infrastructure / Systems renewal

Asset management procurement Design strategy and solution

Feasibility studies

Recent Projects

2026 Berlin | 40MW

RIBA Stage 3
Development of Data Centre MEP design and specification production direct for client to accommodate construction phasing and agnostic principles to suit multiple tenant requirements.

2025 Frankfurt | 27MW

RIBA Stage 3
Support to the tenant team in relation to the MEP, controls, and monitoring network infrastructure design.

2025 Frankfurt | 27MW

RIBA Stages 4-5
Support to the tenant team in relation to the MEP, controls, and monitoring network infrastructure design.

2025 Paris | 4.5MW

RIBA Stage 4
Client support for an existing site to understand operational issues via CFD and design review.

2025 *

RIBA Stage 1 Support
Site feasibility and early design to support the client development and planning submissions. Close liasion with wider design team.
* MW / Location sensitive

2025 London | 70MW

RIBA Stage 4 Peer Review
MEP risk review for an MEP contractor during the tender period – assessing risk and opportunities to capture within their commercial proposals The review included review and collaboration with the RIBA Stage 4 designer to support close out of risks.

2025 Madrid | 40MW

RIBA Stage 3 Peer Review
MEP risk review in partnership with a European data centre designer with the objective of highlighting key areas of design for adaption within the following Stage 4 design.

2025 Paris | 9MW

RIBA Stage 2-3
Development of the RIBA Stage 2-3 for the second phase of a Data Centre project within an existing facility to meet the requirements of a key client customer.

2024 | 13MW

RIBA Stage 4
Design & Build via Contractor. Development of a 13 MW facility within an existing building, including the introduction of a mezzanine level for 6 data halls split over 2 floors.

2023 UK | 40MW

RIBA Stages 3-4
Develop a new design based on client template design principles, to a target CAPEX for 40MW.

2023 UK | 30MW

RIBA Stages 3-5
Design work and site support works necessary through to handover for a 30MW Facility, designed to a target CAPEX budget.

2022 UK | 48MW

RIBA Stage 1
Scheme design 48MW deployment in London.

2022 UK | 18MW

RIBA Stages 4-5
Adaption of an 18MW facility to meet the requirements of multiple end users.

2021 UK | 18MW

RIBA Stages 1-3
Adaption of an 18MW London Slough scheme to meet end users requirement. Design was further adapted to suit tenant specific requirements.

2020 Ireland | 27MW

RIBA Stages 1-2
Permitting and scheme design for 27MW site in Amsterdam. Included feasibility and sustainability studies.

2018 UK | 36MW

RIBA Stages 1-3
Development of two DC sites in Slough with SEGRO Day Final Capacity 36MW.

2017 Dublin | 54MW

RIBA Stages 1-4
Permitting and scheme design for 54MW DC Site in Dublin. Included feasibility and sustainability studies. Leading to scheme design for 4.5MW.

2017 Amsterdam | 27MW

RIBA Stages 1-3
Permitting and scheme design for 27MW site in Amsterdam. Included feasibility and sustainability studies.

2016 Europe | 4.5MW

Scalable design
Taking a US design consultant’s design and converting it to the European market, then completing OFCI based upon this standardised design. Collaborating with a US based procurement company. Exercise completed again in 2023.